Navoi-3 Power Plant Project - Uzbekistan
- Design and engineering works of the 220 kV transmission line between the old and new substations of the Navoi TPP (Phase 3)
Project status: Continues
2022 Sistronik Sistem
- Design and engineering works of the 220 kV transmission line between the old and new substations of the Navoi TPP (Phase 3)
Project status: Continues